Levelized cost of energy (LCOE) is a summary metric that combines the primary technology cost and performance parameters: capital expenditures, operations expenditures, and capacity factor. It is useful for discussing technology advances that yield future projections because it illustrates the combined effect of the primary cost and performance parameters in each of the ATB technology innovation scenarios. The electricity ATB focuses on defining the primary cost and performance parameters for use in electric sector modeling or other analysis where more sophisticated comparisons of technologies are made. LCOE accounts for the energy component of electric system planning and operation. It uses an assumed annual average capacity factor when spreading costs over the anticipated energy generation. Although LCOE accounts for many variables that are important to determining the competitiveness of building and operating a specific technology (e.g., up-front capital costs, capacity factor, and cost of financing), it does not necessarily demonstrate which technology in a given place and time would provide the lowest-cost option for the electric grid. Importantly, LCOE does not capture the economic value of a particular generation type to the system and therefore may not serve as an appropriate basis for comparing technologies. For example, LCOE ignores attributes that can vary significantly across different technologies—in terms of both capability and cost (e.g., ramping, startup, and shutdown)—that could be relevant for more-detailed evaluations of generator cost and value to the system. Such analysis is performed using electric sector models such as the Regional Energy Deployment System (ReEDS) model and corresponding analysis results such as the National Renewable Energy Laboratory's Standard Scenarios.
The 2023 ATB does not include calculation of LCOE or other related financial parameters for fossil-fueled technologies. Refer to the techno-economic studies of electricity generating plants described in the U.S. Department of Energy’s Office of Fossil Energy and Carbon Management's Quality Guidelines for Energy Systems Studies documents (Theis, 2021) for analytic metrics that it recommends as more appropriate to fossil energy technologies, applications, and industries.
The following cost items are included in capital expenditures (CAPEX) for all technologies, unless otherwise noted. Individual technologies may include additional items as explained on the technology pages.
Category | Item |
---|---|
Balance of system/balance of plant | All other major plant components within the facility fence line needed to deliver electricity to the bulk power system |
Electrical infrastructure and interconnection (electrical interconnection, electronic, electrical infrastructure, and electrical) | Internal and control connections On-site electrical equipment (e.g., switchyard)* Power electronics Transmission substation upgrades* |
Generation equipment and infrastructure (civil works, generation equipment, other equipment, and support structure) | Plant construction Power plant equipment |
Installation and indirect | Distributable labor and materials Engineering Startup and commissioning |
Owners' costs | Development costs Environmental studies and permitting Insurance Legal fees Preliminary feasibility and engineering studies Property taxes during construction* |
Site costs | Access roads* Buildings for operation and maintenance* Fencing* Land acquisition* Site preparation* Transformers* Underground utilities* |
* - not included in distributed technologies (residential or commercial)
Specific components of CAPEX are defined as follows:
Capital expenditures excluding construction period financing. Includes on-site electrical equipment (e.g., switchyard), a nominal-distance spur line (<1 mi), and necessary upgrades at a transmission substation.
Distance-based costs of spur lines over land, offshore wind plant export cable costs and construction period transit costs. For all technologies except offshore wind, these are set to zero by default.
Also referred to as construction finance cost. Portion of all-in capital cost associated with construction period financing. It is a function of construction duration, capital fraction during construction, and interest during construction.
The following operating expenditures are included in operation and maintenance (O&M) expenditures for all technologies, unless otherwise noted. Individual technologies may include additional items as explained on the individual technology pages.
Category | Item |
---|---|
Fixed costs | Administrative fees Administrative labor Insurance Land lease payments* Legal fees Operating labor Other Property taxes Site security Taxes |
Fixed costs components | Project management |
Maintenance costs | General maintenance Scheduled maintenance over technical life Unscheduled maintenance over technical life |
Variable cost components | Consumables (e.g., water, chemicals, and catalysts) Waste disposal (e.g., ash, slag, process wastes, and process byproducts that are not otherwise sold) |
Maintenance components | Transformers* |
Replacement costs | Annualized present value of large component replacement over technical life |
* not included in distributed technologies (residential or commercial) |
Capacity factor is generally defined as the ratio of actual annual output to output at rated capacity for an entire year, using a long-term average over the lifetime of an asset, without curtailment for renewable generation. The default capacity factors listed in the ATB data spreadsheet are meant to be representative—actual plant capacity factors will depend on many factors and power plant-specific conditions. The annual capacity factor ignores specific operating behaviors such as ramping, startup, and shutdown that could be relevant for more-detailed evaluations of generator cost and value. Electricity generation technologies have different capabilities to provide capacity and flexibility services. These services are difficult to value and depend strongly on the system in which a new generation plant is introduced. These services are represented in electric sector models such as ReEDS and in corresponding analysis results such as the Standard Scenarios.
Other Data Dimensions
Year
2021 is the base year for the 2023 ATB, because this is the year for which sufficient historical data are available. Sources for the base year include cost and performance estimates from published regularly updated sources or methods. If estimates are not based directly on market data, they are compared with market observations as possible.
2021–2050 is the range of 2023 ATB projections. Projections are based on trend lines between historical data and long-term (2030 or 2035, and 2050) estimated costs. For most technologies, the base year (2021) is the final year of historical data; see below for an explanation of 2022 costs. Near-term values in the ATB do not reflect every local or near-term market condition. With the exception of the 2022 capital cost multiplier, the longer-term ATB projections are not informed by recent changes.
In 2022, market reports indicated prices for many energy technologies rose faster than CPI-based inflation. To account for this, technologies either include 2022 data (if available, see the data master spreadsheet) or use a technology-neutral cost multiplier of 3.5% to increase costs relative to the overnight capital cost. This multiplier is derived from average real price increases in available cost reports, including (Holden et al., 2022)(Witte and Sahd, 2022)(Davis et al., 2022a)(Davis et al., 2022b)(Ramasamy et al., 2022)(Ramasamy et al., 2021)(Metcalfe, 2022)(Narayanan et al., 2022)(Wood Mackenzie, 2022)
All monetary values are in 2021 USD based on the Consumer Price Index for All Urban Consumers (BLS, forthcoming) for dollar year conversions, where the publication source year dollars do not match 2021 unless noted otherwise. Prices are not rigorously distinguished from costs.
Technology Innovation Scenarios
The three technology innovation scenarios are generally described as follows:
Historical investments come to market with continued industrial learning. Technology looks similar to today, with few changes from technology innovation. Public and private R&D investment decreases.
Innovations observed in today's market become more widespread, and innovations that are nearly market-ready today come into the market. Current levels of public and private R&D investment continue. This scenario may be considered the expected level of technology innovation.
Innovations that are far from market-ready today are successful and become widespread in the market. New technology architectures could look different from those observed today. Public and private R&D investment increases.
For nuclear and biopower technologies, technology cost designations appearing in ATB tables and figures refer to technology assumptions and the range of fuel price projections as described on the other technologies page.
Financial Assumptions Cases
Financial assumptions impact LCOE by changing the cost of capital needed to finance electricity generation projects. Two project finance structures are used within the ATB: an R&D Only Financial Assumptions Case (R&D Only Case) and a Market + Policies Financial Assumptions Case (Market + Policies Case).
This sensitivity case allows technology-specific changes to debt interest rates, return on equity rates, and debt fraction to reflect effects of R&D on technological risk perception, but it holds background rates constant and excludes effects of tax reform and tax credits. See the financial assumptions cases and methods for details.
This sensitivity case retains the technology-specific changes to debt interest and return on equity rates from the R&D Only Case and adds in the effects of the tax credits in the Inflation Reduction Act of 2022. See the financial assumptions cases and methods for details.
Cost Recovery Period
An important assumption for computing LCOE is the assumption about the period over which the electricity generation plant's cost and performance are levelized. In the ATB, this period is defined as the cost recovery period, and it represents the period over which the initial capital investment to build a plant is recovered. Three options are available for the cost recovery period. Use the chart below to explore the effects of the cost recovery period.
The technical life for each technology is shown in the following table. A technical life that is longer than the cost recovery period means residual value may be left after costs have been recovered. The value of a 30-year life is justified by current industry trends, such as for wind technologies. However, ReEDS continues to use a 20-year cost recovery period for all generating technologies regardless of their technical life.
Technology | Technical Life (years) |
---|---|
Land-based wind | 30 |
Offshore wind | 30 |
Distributed wind | 30 |
Solar: Utility-scale PV | 30 |
Solar: Distributed commercial PV | 30 |
Solar: Distributed residential PV | 30 |
Solar: Concentrating solar power | 30 |
Geothermal | 30 |
Hydropower | 100 |
Utility-scale PV-plus-battery | 30† |
Utility-scale battery storage* | 15 |
Commercial battery storage* | 15 |
Residential battery storage* | 15 |
Pumped storage hydropower* | 100 |
Coal* | 30 |
Biopower | 45 |
Natural gas* | 30 |
Nuclear | 60 |
* Although LCOE is not computed for energy storage or fossil technologies, design technical life is included here for comparison. † A project life of 30 years for PV-plus-battery assumes replacing all battery cells at year 15 (Cole and Karmakar, 2023). |
Technology Detail Assumptions
Technology details indicate resource levels and specific technology subcategories. Minima and maxima show the range of resource- and technology-specific values. For renewable technologies, ranges span resource characteristics available within the contiguous United States.
The ATB plant characteristics (and associated resource quality) that most closely align with recently installed or anticipated near-term installations of electricity generation plants are defined as the representative value. The representative value for renewable technologies is calculated based on the resource quality that is used in recent or near-future plants in the base year, in combination with the technology cost and performance and financial assumptions indicated. For coal and natural gas technologies, only technology cost and performance are indicated. The technology detail plant characteristics selected as representative values are as follows (see individual technology pages for descriptions of ATB representative plant characteristics):
- Land-based wind: Wind Speed Class 4 - Technology 1
- Offshore wind: Wind Speed Class 3
- Distributed wind: Wind Speed Class 7
- Utility-scale PV: Class 5: GHI (global horizontal irradiance) of 4.75–5 kWh/m2/day
- Commercial PV: Class 5: GHI of 4.75–5 kWh/m2/day
- Residential PV: Class 5: GHI of 4.75–5 kWh/m2/day
- Concentrating solar power: Class 2: excellent resource (refers to Daggett, California, resource of 7.65 kWh/m2/day DNI [direct normal irradiance])
- Geothermal: hydrothermal flash technology
- Hydropower: non-powered dam (NPD) 1
- Utility-Scale PV-Plus-Battery: Class 5: GHI of 4.75–5 kWh/m2/day
- Utility-Scale Battery Storage: 60 MW, 240 MWh
- Commercial Battery Storage: 600 kW, 2,400 kWh
- Residential Battery Storage: 5 kW, 12.5 kWh
- Pumped Storage Hydropower: National Class 3: 905 MW average generation capacity
- Fossil Energy Technologies:
- New natural gas: NG F-Frame CC 95% CCS
- New coal: Coal-95%-CCS
- Other technologies (EIA):
- Nuclear: no range represented in the ATB; may be developed in future collaborations with nuclear experts
- Biopower: EIA (U.S. Energy Information Administration)-dedicated.
New to the 2023 ATB, technology details can be classified as mature or nascent. Technology details are defined as mature if a representative plant is operating or under construction in the United States in the base year. In the data master spreadsheet, mature technology details are marked with "Y" in the maturity column, and nascent details are marked with "N."
Standard Assumptions (unless otherwise noted on specific technology pages)
Labor costs are the average of union and nonunion labor rates.
Capital costs represent a national average benchmark. Regional variations are not applied.
Materials costs are given in 2021 USD, based on the Consumer Price Index for All Urban Consumers (BLS, forthcoming) for dollar year conversions.
Technology costs assume fully mature and industrialized supply chain and manufacturing capacity for a given technology and economies of scale are reached.
Financial assumptions include financial effects of selected laws and regulatory regimes that are currently in effect.
All values are given in 2021 USD, using the Consumer Price Index for All Urban Consumers (BLS, forthcoming) for dollar year conversions where the source year dollars do not match 2021. Financial calculations for projections use an inflation assumption when converting between nominal and real interest rates. This value is assumed to be 2.5% in the R&D case, and the same value is used for 2024 through 2050 in the Markets + Policies case. Other years are reflected in the following table.
Commercial Operation Year | Project Life Average Value |
2021 | 2.79% |
2022 | 2.72% |
2023 | 2.53% |
Though inflation may be higher or lower in any particular year, these values represent average inflation over the life of the project.
Other
Regional multipliers are not used in ATB, but they are often applied in modeling tools such as ReEDS. For regional capital cost multipliers for the United States, see the ReEDS model documentation (Ho et al., 2021).
This factor is applied to an overnight capital cost to represent the financing costs incurred during the construction period. In the calculation of construction finance factor in the ATB spreadsheet, year index 0 is closest to the plant's commercial operation date, and the highest year number corresponds to the start of construction.
Limitations
See the following links for the disclaimer agreement and a guide to technical limitations.
References
The following references are specific to this page; for all references in this ATB, see References.